Pressure Grout/Mud jack BEFORE
Middle of building has settled. Roof and door are crooked.

Pressure Grout/Mud jack AFTER
Roof and Door are level again.

Pressure Grout/Mud jack BEFORE
Prior to lifting, the floor was 4 inches below level.

Pressure Grout/Mud jack AFTER
After the lift, the floor was very close to level.

Pressure Grout/Mud jack
Holes were drilled throughout the shop floor in preparation for the lift.

New basement dig out
First, one foundation wall was prepared.

New basement dig out
A new egress window was installed.

New basement dig out
The dirt inside the new foundation wall needed to be removed.

New basement dig out
The basement was excavated to 8 feet.

New basement dig out
The structure was supported by beams until all of the new basement walls were built.

Wall pull BEFORE
This basement foundation wall was bowed in at the top about 14 inches.

Wall pull AFTER
The wall was pulled back into proper position and supported on both sides.

Wall Pull AFTER
The wall supports are repeated on the exterior

Wall pull crack repair BEFORE
After the wall is pulled back into place, the cracks must be repaired.

Wall pull crack repair AFTER
Cracks are sealed.
Foundation Repair
Holes are dug in strategic locations in preparation for a foundation lift.
Foundation Lift
This foundation was raised about 16 inches.

Porch lift BEFORE
This cement porch was settled and separated from the supporting beam.

Porch lift AFTER
The porch was raised until no gap was visible.